2950 – Bundamba Sewerage Treatment Works – Switchboard Arc-fault Upgrade
Scope
Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation & Commissioning. Arc fault contained switchboards.
Attributes
5 ACBs. Automatic Transfer System. Arc flash detection system.
Challenges
Retrofitting brownfield sites. Unidentified equipment, limited drawings. Temporary boards and generators to keep plant running through change-over.