Water Pumping Booster Station Electrical Controls Replacement
Scope
Design, supply, install and commission 10 public utility outdoor Water Booster Control Switchboards with ABCD Arc Fault Containment Modular Outdoor systems.
Attributes
Complete Turnkey Contract for ten locations across Brisbane region.
Integrated design, manufacture, installation and commission project coordinating civil, structural and mechanical contractors.
All systems required slightly different requiring tailored modules for applications.
Challenges
First significant production run of new ABCD Switchboards. • Geographic speed of locations • Efficient coordination of installation teams while accomodating client changeover constraints.
Testimonial
- Great result under difficult weather conditions
- Employing, managing and collaboration with local sub-contractors