City of Gold Coast – Merrimac Treatment Plant
Scope
Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation & Commissioning. 2 Type Tested Form 3b Motor Control Centre IP54. 70+ Motor power/control cubicles supplied.
Attributes
Incoming Section. Metering. Variable Speed Drives. Soft Starters. DOLs. UPS System. Marshaling Section. Distribution Section.
Challenges
Working on brownfield sites. Temporary boards and generators to keep plant running through change-over.