Project Description

SEQ Water – Heineman RD Pump Station

Scope

Design, Manufacture, Integration, Factory Acceptance Test, Deliver to site, Installation, Commissioning. Type Tested Form 3b MCC to IP54.

Attributes

Incomer Section. Metering. Variable Speed Drives. DOLs. UPS System. PLC Section. Distribution Section. HMI.

Challenges

Live site changeover. Risk management for spills.